ZeroDelay Academy · Follow-up and handoff worksheet
Plumbing parts readiness before dispatch: a job-by-job check
Putting a job on the calendar and having the right parts in hand are separate facts. This log records, for each job, the requisition, whether the supplier confirmed availability, whether a qualified person checked compatibility and whether the customer approved the scope, so only genuinely ready jobs consume technician hours.
By ZeroDelay.ai · An educational framework, not a customer case study
A question to start with
Of the jobs waiting to go out, which have confirmed, compatible parts and an approved scope, and how many hours do those ready jobs actually need?
Step 1
Log the requisition against the job
For each job, record the part requested, the requisition date and who raised it. A purchase order or delivery estimate is not a received part; mark received only when it is physically available.
Step 2
Separate confirmation, compatibility and approval
Record supplier-confirmed availability, a compatibility check by a qualified plumber, and customer approval of the scope (including any customer-supplied part) as three separate yes, no or pending entries. Office staff record status; they never diagnose or choose parts to install.
Step 3
Dispatch only ready jobs
A job is ready when all entries are yes. Sum estimated person-hours for ready jobs plus travel, and hold the rest with a named owner and next check date rather than sending a technician to find out.
Records to gather first
- Open jobs with approved scope or pending approvals.
- Requisitions, purchase orders and supplier confirmations.
- Receiving records showing what has physically arrived.
- Compatibility notes from the qualified plumber assigned.
- Estimated job durations and travel.
Copy or print this blank worksheet
Copy the table into your own document or use your browser's Print command, then fill it in there or on paper. There are no entry fields here, nothing is saved, and numbers you write do not transfer into the diagnostic.
| Job / reference | Part requisitioned | Supplier confirmed | Part received | Compatibility checked by | Scope approved | Ready (yes/no) | Est. person-hours |
|---|---|---|---|---|---|---|---|
| Job 1 | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| Job 2 | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| Job 3 | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| Job 4 | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| Job 5 | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| Job 6 | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| Travel | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| Total ready hours | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
Fictional worked example
All figures are made-up assumptions to show the arithmetic. They are not industry benchmarks, customer data, achieved outcomes or a forecast for your business.
Assumptions
- Fictional log of 6 jobs: 2 ready, 2 with wrong or unverified items, 1 with supplier availability unconfirmed, 1 with a customer-supplied part awaiting approval.
- Each ready job is estimated at 1.5 person-hours, plus 0.5 person-hours of travel in total.
Simple math
- Check the log adds up: 2 + 2 + 1 + 1 = 6.
- Ready work: 2 × 1.5 = 3 person-hours, plus 0.5 travel = 3.5 person-hours.
- Four jobs stay off the dispatch list until each blocking item is resolved.
What this suggests checking: Only 3.5 person-hours are genuinely dispatchable. The four held jobs each need a specific next action: a corrected requisition, a supplier answer or a customer approval, each with an owner.
What this cannot tell you
- Not technical guidance on part selection or installation; those decisions belong to qualified plumbers.
- Calendar assignment and estimate follow-up are separate workflows.
- Fictional figures; not plumbing benchmarks.
Public reading and methodology
The worksheet, steps and fictional arithmetic on this page are original to ZeroDelay.ai. The public pages below cover related topics; they were read for context and do not validate any outcome from this worksheet or from ZeroDelay.
- Plumbing Dispatch Checklist: Send the Right Job Information (GoPlumber). Commercial vendor page with a section titled "Distinguish assignment from readiness". Topic context only; no partnership or product endorsement is implied, and this worksheet is original.
Choose a next step from your worksheet
When a missing part causes a return visit, record only the added time and cost before judging the original job's contribution. Trace plumbing labor and callback cost gaps.
For a separate, no-signup calculation, open the free Profit Leak Check. Choose plumbing to compare labor variance and extra callback cost with collected revenue; it does not check stock, dispatch technicians or diagnose a parts problem. Calculations stay in your browser.
If this worksheet raises a wider business question, the diagnostic below uses the answers you provide about your business; it does not import this worksheet or calculate its results. View the fictional sample 90-Day Plan to see an illustrative complete paid report, not your free results or a promised outcome. Available market research varies.